timeline length

Does anyone know if there is a way to increase the scene length of the timeline in tbs from 16,000 frames to 18,500?
Thanks,
Tom

Hi Tom,

You should not have need to have such a long scene in a project. Having that much information loaded in memory will most likely crash the application due basically to a lack of Ram and virtual memory.

Be aware that all the content of a scene needs to be loaded on your machine for playback purpose. I would strongly recommend you to start working with multiple scene. This will give you much more flexibility and will enhance your work speed. To do so simply open the Scene Manager and create new scene. If you want to recover where you were in the last scene simply make a template of the last frame and continu from there.

Best regards,

Ugo